Inspection Smart Key Unit – Refer to the BE group - inspection / self diagnosis with GDS. Smart Key Switch – Refer to the BE group - inspection / self diagnosis with GDS.
Specification ItemDescriptionPower source3VOperating temperature-20°C ~ +60°C (-4°F ~ +140°F)RF ModulationFSKLF ModulationASKRF frequency433.92MHzBattery1EA (CR2032) An inappropriately disposed battery can be harmful to the environment and human health.
Removal 1. Disconnect the negative (-) battery terminal. 2. Remove the crash pad lower panel. (Refer to Body - "Crash Pad") 3. Disconnect the 6P connector (B) of the coil antenna and then remove the coil antenna (A) after loosening the screw.
Description System Overview The System offers the following features: – Human / machine interface through a 1-stage button, for terminal switching and engine start. – Control of external relays for ACC / IGN1 / IGN2 terminal switching and STARTER, without use of mechanical ignition switch.