| Specification |
| A/F Ratio (λ) | Output Voltage(V) |
| RICH | Min. 0.8 |
| LEAN | Max. 0.1 |
| Item | Specification |
| Heater Resistance (Ω) | 3.3 ~ 4.1[20°C(68°F)] |
Description Heated Oxygen Sensor (HO2S) consists of the zirconium and the alumina and is installed on upstream and downstream of the Warm-up Catalytic Converter (WCC).
Removal 1. Disconnect the negative (-) battery terminal. 2. Remove the glove box housing. (Refer to Body - "Glove Box Housing") 3. Remove the SVM unit (B) after disconnecting the connectors (A) and mounting bolts. Installation 1. Install the SVM unit.
Refrigerant System Service Basics Refrigerant Recovery Use only service equipment that is U.L-listed and is certified to meet the requirements of SAE J2210 to remove HFC-134a(R-134a) from the air conditioning system. – Air conditioning refrigerant or lubricant vapor can irritate your eyes, nose, or th